Saturday, December 24, 2011

House Update for December

Batt and Board finished, now prepping for Cultured Stone
Installing the backer board for the tile. Allen and Gayla came to help. THANK YOU!!!
Another view of the backer board in the dining, family and kitchen.
Entry and Hall to Kitchen
Batts of insulation in the Master Bedroom
Walls and Ceiling insulated with "bib system" insulation. {Very efficient}
Master Bedroom Sheetrock
Office Insulation Batts
Sprayed foam to seal the cracks and bib system in ceiling
Dining Room Insulation
Our former house had a small closet under the stairs. Ms A and her friends loved to play in it. They've grown a bit so when this house was designed we were excited to have the bigger closet under the stairs.
Diningroom Sheetrock. It's getting closer to those pretty finished walls. :)

No comments: